黑人巨茎大战俄罗斯美女_亚洲人成人影院在线观看_亚洲色精品88色婷婷七月丁香_精人妻无码一区二区三区_人妻少妇精品视频无码专区

NEWS

Molong’s Products Used in the 5780 Meters Onshore
News trends
    This year Molong’s Φ88.9 N80E Tubing was test in the down hole to the extent of 5750 meters of Yingmai No.37 Well located in the Northern Talimu Basin in Xinjiang Autonomous Region. This test totally consists of loads and unloads for three times. During site test, the thread is kept perfect without any damage and galling. This successful test means Molong’s techniques on OCTG can match the rigid geological condition and deep well.

Publisher:Information manager   Date:2007-12-20